How Artificial Intelligence Could Revolutionize Construction

Image
Often, the concept of AI (artificial intelligence) and robotics are combined into one futuristic notion of how advanced intelligence and technology will impact business. However, the concepts—each very different in nature—serve a specific purpose on construction jobsites today and will only expand in the future. How will artificial intelligence impact the construction industry? It is important to identify where we have been and where we are going with regards to artificial intelligence in construction. Dan Kara, research director, robotics, ABI Research, says many consider robotics to be a subset of artificial intelligence—but it is not. “Robotics systems, those technologies that sense, think and then act in the physical world, can make use of artificial intelligence techniques such as machine learning for the ‘thinking’ component, but it is not a necessity,” he explains. “In fact, most of the robotics systems in operation today do not. That will change, of course.” So whe...

Digital Asset Management (AIM) Asset information Model, Live BIM FM

Image
What is BIM?  Building Information Modeling (BIM) is changing the way projects are constructed. Whether you are a prime contractor using BIM across an entire project or a subcontractor impacted by a specific BIM implementation, this emerging practice requires new mindsets and technological know-how in order to achieve significant improvements in efficiency and cost control. BIM is the gateway to completely modernising our industry with the seamless digital exchange of information that is secure and sensitive to the context of each stakeholder in the design, construction and operation of infrastructure and facilities. So what are we doing? We understand that owners require maintaining their buildings. This is why we created Live BIM FM. Live BIM FM is an online cloud based model and asset viewing platform. What does "Live BIM FM" do?  Live BIM FM closes the gap between design and construction BIM. Allow facility managers to access live data, about the Build...

Developers, Contractors and Operators need to talk!

So working with Developers, contractors and operators on several projects. There always seems to be an issue somewhere down the line. How it usually goes down is a little bit like this; 1- The developer sets out requirements, whether that is O+M or design specification, at which point will usually be wrong. 2- The contractor usually will follow what is set out in their scope, do what is asked in contractual documents. 3- The operator often gets left over with missing/or irrelevant operations and maintenance information or simply put it can't find the information that is required at the time of operation and maintence. It is thought that Integrating the approach and getting all the parties involved in the process earlier, will give all parties what they want. Would BIM help them achieve this integrated apporach ? Leave your comments and ideas below!!

What is 5D BIM?

Image
The fifth dimension is taking simple 3d geometry and applying the cost element   Drawing on the components of the information model being able to extract accurate cost information is what's at the heart of 5D BIM.   Considerations might include capital costs (the costs of purchasing and installing a component), its associated running costs and the cost of renewal/replacement down the line. These calculations can be made on the basis of the data and associated information linked to particular components within the graphical model. This information allows cost managers to easily extrapolate the quantities of a given component on a project, applying rates to those quantities, thereby reaching an overall cost for the development.   The benefits of a costing approach linked to a model include the ability to easily see costs in 3D form, get notifications when changes are made, and the automatic counting of components/systems attached to a project. However, it's n...

What is 4D BIM?

Image
They always ask. What is construction sequencing? what is 4D? Here is your answer. 4D BIM adds an extra dimension of information to a project information model in the form of scheduling data. This data is added to components which will build in detail as the project progresses. This information can be used to obtain accurate programme information and visualisations showing how your project will develop sequentially.   Time-related information for a particular element might include information on lead time, how long it takes to install/construct, the time needed to become operational/harden/cure, the sequence in which components should be installed, and dependencies on other areas of the project.

A further understanding to 2D and 3D BIM.

Image
A further understanding to 2D and 3D BIM.  Firstly, we have started off with 2d.     2D, as we know it on paper. That is the X,Y axis. This hand drawing, this is auto cad.    The third dimension 3D, Is the addition of adding the Z axis.    3D BIM is perhaps the BIM we are most familiar with - the process of creating graphical and non-graphical information and sharing this information in a Common Data Environment (CDE).   As the project lifecycle progresses this information becomes ever more rich in detail until the point at which the project data is handed over to a client at completion.   

What are the different dimensions of BIM?

Image
The confusion is real. The other day I had a customer come and enquire about Level 5 BIM?? I mean really.. I said what do mean about Level 5 BIM, he said I want costing.. So I thought i'd create a video about the different dimensions of BIM

What is BIM ?

Image
BIM is an acronym for Building Information Modelling, or Building Information Model. It describes the process of designing a building collaboratively using one coherent system of computer models rather than as separate sets of drawings. Social Media: www.instagram.com/agkcreativebim www.twitter.com/agkcreativebim follow and support

Efficiently communicating to clients during design and construction phases

Image
Good Evening ,  I receive many questions on managing client expectations and effectively communicating to clients BIM status. Communicating to client / stakeholders where they stand on BIM can sometimes be an issue, if the client is not well BIM educated. What exactly do you communicate with the client? Is it how many attributes are in the model? LOD? Is the design team meeting the requirements set in the EIR or bim execution plan? Or that doesn't really matter, all procedures appear to be nonsense to stakeholders and they only want to see one result...and that is, is the design coordinated or not.  Now to get to this stage, one must come up with a clever solution to provide feedback on the design and models through a clever system, that's goes through a series of checks. Not just geometry but level of information existing in the model as well.  Simply a traffic light system attached with scores, if you apply the system to incoming design mode...